海外燃煤电站项目风险管理研究

Study on Risk Management of Overseas Coal-Fired Power Station Projects
下载PDF
导出
摘要 以风险管理理论为基础,运用层次分析法对S公司海外EPC总承包项目中存在的风险进行分析评估。分析结果得出合同风险在所有项目风险中对项目影响最大,达到0.156。其次是安全风险和经济风险,分别达到0.132和0.136。文中给出具体风险的应对措施和策略,在项目的执行过程中出现的合同风险、安全风险和经济风险应特别注意。 Based on the risk management theory,the analytic hierarchy process is used to analyze and evaluate the risks existing in overseas EPC general contracting projects of S company.The result of the analysis is that the contract risk has the greatest impact on the project among all project risks,reaching 0.156.Secondly,the security risks and economic risks reaches 0.132 and 0.136 respectively.The countermeasures and strategies for each type of risk are given in the paper.Contractual risks,safety risks and economic risks arising during the implementation of the project should be paid special attention.
作者 李世博 杨耀辉 朱晓明 LI Shi-bo;YANG Yao-hui;ZHU Xiao-ming(SIPPR Engineering Group Co.,Ltd,Zhengzhou 450007 China)
出处 《科技创新与生产力》 2019年第7期43-45,共3页 Sci-tech Innovation and Productivity
关键词 EPC 总承包 国际燃煤电站 层次分析法 风险管理 EPC general contracting international coal-fired power station analytic hierarchy process risk management
  • 相关文献

参考文献2

二级参考文献12

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部