CTCS3无线闭塞中心工程化数据生成方法与实现 被引量:1

Engineering data generation method and implementation of CTCS3 radio block center
下载PDF
导出
摘要 为保证在实际工程项目实施中,能够更精准、高效的完成无线闭塞中心(RBC,Radio Block Center)的工程化数据配置,通过分析列控地面工程数据和RBC数据结构,提出一种RBC工程化数据生成方法。基于RBC工程化数据配置规则,采用C#和NPOI,开发了由列控地面工程数据到RBC工程化数据的数据转换工具。经试验表明,RBC工程化数据生成方法是可行的。该数据转换工具显著节约人工成本、缩短项目周期,目前已成功应用于8套RBC的工程化数据配置。 In order to ensure that the engineering data configuration of Radio Block Center(RBC)can be accomplished more accurately and efficiently in the actual project implementation,a method of RBC engineering data generation was proposed by analyzing train control ground engineering data and RBC data structure.Based on RBC engineering data configuration rules and using C#and NPOI,this article developed a data conversion tool from train control ground engineering data to RBC engineering data.Experiments show that the RBC engineering data generation method is feasible.The data conversion tool can significantly save labor costs and shorten the project cycle.It has been successfully applied to the engineering data configuration of eight wireless blocking centers.
作者 徐强 崔龙 黄琨 XU Qiang;CUI Long;HUANG Kun(Signal&Communication Research Institute,China Academy of Railway Sciences Corporation Limited,Beijing 100081,China)
出处 《铁路计算机应用》 2019年第8期52-56,74,共6页 Railway Computer Application
基金 中国铁道科学研究院基金课题(2016YJ062)
关键词 CTCS-3级列控系统 无线闭塞中心 列控数据 Chinese Train Control System Level 3(CTCS 3) Radio Block Center(RBC) train control data
  • 相关文献

参考文献5

二级参考文献21

共引文献24

同被引文献5

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部