摘要
城市地下综合管廊作为城市市政基础设施的重要组成部分,其发展很大程度上影响着城市现代化进程的推进,将BIM技术应用到城市地下综合管廊施工阶段,通过建立基于BIM技术的进度、成本、质量、安全控制与管理平台,实现城市地下综合管廊施工的可视化、信息化、精细化管理。
Urban underground integrated pipe gallery is an important part of the city s municipal infrastructure.Its development has largely affected the advancement of urban modernization process.BIM technology has been applied to the construction of urban underground integrated pipe corridors,and the progress based on BIM technology has been established.Cost,quality,safety control and management platform to realize visualization,informationization and refined management of urban underground integrated pipe gallery construction.
作者
戚欣
张小龙
王婉
QI Xin;ZHANG Xiao-long;WANG Wan(Jilin Jianzhu University)
出处
《智能建筑与智慧城市》
2019年第7期119-120,123,共3页
Intelligent Building & Smart City
基金
国家住房与城乡建设部科学技术计划项目(2017-R3-008)
关键词
BIM技术
市政工程
综合管廊
施工
BIM technology
municipal engineering
comprehensive pipe corridor
construetion