1000MW高效宽负荷率的超超临界锅炉开发 被引量:2

Development of ultra-supercritical boiler with 1000MW high efficiency and wide-load rate
下载PDF
导出
摘要 根据反平衡法对电站锅炉各项效率损失进行分析,潜力较大的是排烟损失和未完全燃烧损失,主要影响因素有过量空气系数、排烟温度、燃烧效率;1000 MW高效宽负荷率超超临界煤粉锅炉的开发采用低过量空气系数设计理念,在炉膛选型、受热面布置、燃烧系统设计、降低锅炉漏风等方面采取措施。与传统设计相比,50%THA负荷下锅炉效率提升了0.96%。 According to the anti-balance method,the efficiency losses of power station boilers were analyzed.The potential of smoke loss and incomplete combustion loss was large.The main influencing factors were excess air coefficient,exhaust temperature and combustion efficiency;the development of 1 000 MW high-efficiency and wide-load rate ultra-supercritical pulverized coal boiler adopts the design concept of low excess air coefficient,and took measures in the aspects of furnace selection,heating surface layout,combustion system design and reduction of boiler leakage.Compared with the traditional design,the boiler efficiency was increased by 0.96%under 50%THA load.
作者 冉燊铭 潘绍成 刘宇钢 唐勇 霍锁善 Ran Shenming;Pan Shaocheng;Liu Yugang;Tang Yong;Huo Suoshan(Sichuan Province Key Laboratory of Combustion and Flue Gas Cleaning,Chengdu 611731,China;Dongfang Boiler Group Co.,Ltd.,Dongfang Electric Corporation,Zigong 643001,China)
出处 《能源与环保》 2019年第8期108-113,共6页 CHINA ENERGY AND ENVIRONMENTAL PROTECTION
基金 国家科技支撑计划项目(2015BAA03B01)
关键词 高效 宽负荷率 煤粉锅炉 热损失 high efficiency wide-load range pulverized coal fired boiler heat loss
  • 相关文献

参考文献8

二级参考文献48

共引文献199

同被引文献21

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部