摘要
介绍了百色市右江百林桥至广州桥段岸坡加固工程的基本情况,分析了该段岸坡稳定的现状。提出岸坡加固方案,加固工程分为3个区域,一、三区采用重力挡土墙加固,二区采用机械钻孔灌注桩加固。
An introduction was made on the general information of Bailin bridge-Guangzhou bridge Youjiang River section bank slope reinforcement project in Baise City.The author analyzed the stability status of current bank slope and put forward the reinforcement scheme.The whole project is divided into three areas.Gravity earth retaining wall is designed for No.1 and NO.3 areas,while mechanical bore filling pile is designed for No.2 area.
作者
盘霞
黄强
PAN Xia;HUANG Qiang(Guangxi Transport Vocational and Technical College,Nanning 530023,China;Nanning Survey and Design Institute of Pearl River Commission,Nanning 530007,China)
出处
《广西水利水电》
2019年第4期64-66,共3页
Guangxi Water Resources & Hydropower Engineering
基金
广西高校中青年教师基础能力提升项目(2019KY1354)
关键词
岸坡加固
设计方案
重力挡土墙
灌注桩
Bank slope reinforcement
design scheme
gravity earth retaining wall
filling pile