巴基斯坦卡拉奇核电站K2、K3项目作为我国自主设计的第一个全厂DCS系统的核电项目,在保护系统的设计上采用数模混合方案,本文介绍了保护系统有关的应对设计,涉及总体结构、设计特点、定期试验等方面的内容。
The Pakistan Karachi K2/K3 project,as the first nuclear power project with the whole plant DCS system using mixed digit and analog mode,which is independently designed by China,the paper introduces the design of the reactor protection system,which involves the overall structure,design features,T3 test and other aspects of the experiment.