期刊文献+

水利工程规划阶段工程测绘重点探究

Discussion on the Key Points of Engineering Surveying and Mapping in the Planning Stage of Water Conservancy Project
下载PDF
导出
摘要 就一个完整的水利工程的施工和设计工作的实施来看,牵涉到大量的工序。工程测绘工作对于水利工程来说是十分重要的,在水里工程的建造中,各个阶段都是会利用到诸多的测绘方式以及测绘技术。在实施测绘操作工序的时候,需要对各项重点工作加以侧重关注。需要认真的遵照各项工作的实际要求,遵从各项操作原则,才能够切实的高效的开展水利工程规划设计工作。这篇文章主要围绕水利工程规划过程中工程测绘工作的关键实施综合研究,希望能够对这项工作的健康发展有所帮助。 From the point of view of the construction and design of a complete water conservancy project,a large number of processes are involved.Engineering surveying and mapping work is very important for water conservancy project.In the construction of water engineering,many surveying and mapping methods and techniques will be used in all stages.In the implementation of surveying and mapping operation procedures,it is necessary to pay attention to the key work.In order to carry out the planning and design of water conservancy project effectively and efficiently,we should conscientiously abide by the actual requirements of all kinds of work and abide by the operation principles.This article mainly focuses on the comprehensive research on the key implementation of engineering surveying and mapping in the process of water conservancy project planning.We hope to be able to help the healthy development of this work.
作者 郭熙和 孟秋雨 杜洪全 GUO Xihe;MENG Qiuyu;DU Hongquan(Research Institute of Survey and Design,Shandong Agricultural University,Shandong Taian,271018 China)
出处 《工程建设(维泽科技)》 2019年第9期39-40,共2页 Engineering Construction
关键词 水利工程 规划阶段 测绘 Water conservancy project Planning phase Mapping
  • 相关文献

参考文献5

二级参考文献10

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部