期刊文献+

FROM LANDLOCKED TO LAND-LINKED China-Laos Railway leads to win-win development

下载PDF
导出
摘要 The construction site of the Luang Prabang section of the China-Laos Railway(CLR)glows under splashes of electric sparks as work proceeds.Despite streams of sweat flowing down his cheeks,Kham Phuang Ta Va manages to maintain a radiant smile.Electric welding is considered a tough and tedious job,but for Kham Phuang Ta Va,a technician working on the CLR’s Luang Prabang section,the job is enabling him to seize a better life through his own efforts.
机构地区 不详
出处 《China Report ASEAN》 2019年第8期32-35,共4页 中国东盟报道(英文)
关键词 TOUGH MAINTAIN SPITE
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部