摘要 对超高松散物料内排土场下原岩开挖+混凝土盖板方案和格宾笼+混凝土涵2种方案进行FLAC3D三维地质建模和数值模拟分析,根据数值模拟结果对比分析2种方案的混凝土不均匀竖向变形、软岩小主应力、混凝土小主应力等,进行对比得出最优结果。 FLAC3D three-dimensional geological modeling of the original rock excavation and concrete cover slab scheme and the latter cage and concrete culvert scheme is numerically simulated and analyzedbased on the innerdump of super-high loose material.According to the numerical simulation results,the non-uniform vertical deformation of concrete,small principal stress in soft rock and small principal stress in concrete of the two schemes are compared and analyzed,and the optimal results are obtained.
作者 张镭 王勇 ZHANG Lei;WANG Yong(Yunnan Coal Chemical Industry Group,Kunming 001001 China;China Coal Science and Technology Group Shenyang Design and Research Institute Co.,Ltd.,Shenyang 110015 China)
出处 《露天采矿技术》 CAS 2019年第4期74-77,共4页 Opencast Mining Technology
关键词 应力变形 数值模拟 残余水治理 排水管涵 高填方 pressure deformation numerical simulation residual water treatment drainage culvert high fill
  • 相关文献

参考文献10

二级参考文献17

共引文献131

同被引文献32

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部