摘要
在经济全球化的背景下,我国的建筑施工技术已经走出国门,并获得世界范围内的广泛关注。其中,新加坡裕廊区域线J105标段,是由中铁十四局集团有限公司负责投标编写投标期间施工方案以及如果中标后参与施工的。文章对该标段的施工概况、施工难点、施工方案等内容进行探究。目的是为相关人员提供参考,加深对工程施工技术的认识。
In the background of economic globalization,our country's construction technology has gone out of the national gate and gained wide attention in the world.Yulong District Line J105 section in Singapore is one of them.China Railway Fourteenth Bureau Group Co.,Ltd.is responsible for bidding to prepare the construction plan during the tender and participate in the construction if the bid is won of it.This paper probes into the construction situation,construction difficulties and construction scheme of the section.The purpose is to provide reference for relevant personnel and deepen the understanding of engineering construction technology.