8Karimi I, Hullermeier E. Risk assessment system of natural hazards: a new approach based on fuzzy probability[J]. Fuzzy Sets and Systems, 2007(158):987-999.
9Leung M, Lambert J H, Mosenthal A. A Risk- based approach to setting priorities in protecting bridges against terrorist attacks[J]. Risk Analysis, 2004,24(4).
10Pasquale G D,Orsini G,Romeo R W. New develop- ments in seismic risk assessment in italy[J]. Bulle- tin of Earthquake Engineering,2005(3) :101-128.