期刊文献+

导弹弹体加工车间调度仿真系统设计与实现

Design and Implementation of the Missile Body Processing Workshop Scheduling Simulation System
下载PDF
导出
摘要 为解决弹体加工车间因生产周期长,生产过程资源耗费大,研究样本少等缺点不便于展开调度问题研究的难题,本文基于C#.NET设计实现了导弹弹体加工车间调度仿真系统。该系统经过科学的需求分析,从体系框架、系统功能和数据结构三方面展开设计,实现了静态调度与动态调度相结合的车间调度系统仿真,能在一定程度上提高弹体加工车间工作效率,并为车间调度算法研究提供仿真平台。 As the missile body processing workshop production cycle is long,production process resources are expensive,and research samples are less,it is difficult to do research on the problem of missile body processing workshop scheduling.In order to solve this problem,the missile body processing workshop scheduling simulation system is designed.After scientific demand analysis,the system is designed from three aspects of system framework,system function and database,and the simulation of workshop scheduling combining static scheduling with dynamic scheduling is realized.It can improve the working efficiency of missile body processing workshop to a certain extent,and provide a simulation platform for the study of workshop scheduling algorithm.
作者 田龙 崔连虎 TIAN Long;CUI Lian-hu(The Unit 91336 of PLA,Qinhuangdao 066001 China)
机构地区 中国人民解放军
出处 《自动化技术与应用》 2019年第8期44-48,共5页 Techniques of Automation and Applications
关键词 JOB Shop车间调度 仿真系统 导弹弹体 Job Shop workshop scheduling simulation system missile body
  • 相关文献

参考文献5

二级参考文献41

  • 1咸斌.基于关联技术的自顶向下设计技术的应用研究[J].机械设计与制造,2005(7):29-31. 被引量:13
  • 2郑金桥,王义林,李志刚.An Intelligent Master Model of Computer Aided Process Planning for Large Complicated Stampings[J].Journal of Southwest Jiaotong University(English Edition),2005,13(2):103-112. 被引量:3
  • 3柯常忠,谢少波.基于参数化技术的自顶向下设计[J].中国制造业信息化(学术版),2007,36(2):50-52. 被引量:6
  • 4SAYGIN C,KILLICS E.Integrating flexible process plans with scheduling in flexible manufacturing systems[J].International Journal of Advanced Manufacturing Technology,1999,15(4):268-280.
  • 5KUMAR M,RAJOTIA S.Integration of process planning and scheduling in a job shop environment[J].International Journal of Advanced Manufacturing Technology,2006,28 (1/2):109-116.
  • 6SHAO X Y,II X Y,GAO L,et al.Integration of process planning and scheduling-a modified genetic algorithm-based approach[J].Computer Operation and Research,2009,36(6):2082-2096.
  • 7LI X Y,SHAO X Y,ZHANG C Y.Mathematical modeling and evolutionary algorithm-based approach for integrated process planning and scheduling[J].Computers and Operation Research,2010,37(4):656-667.
  • 8CHRYSSOLOURIS G,CHAN S,COBB W.Decision making on the factory floor:an integrated approach to process planning and scheduling[J].Robotics and Computer-Integrated Manufacturing,1984,1(3/4):315-319.
  • 9WANG L H,SHEN W M,HAO Q.An overview of distributed process planning and its integration with scheduling[J].International Journal of Computer Applications in Technology,2006,26(1/2):3-14.
  • 10PHANDEN R K,JAIN A,VERNMA R.Integration of process planning and scheduling:a state-of-the-art review[J].International Journal of Computer Integrated Manufacturing,2011,24(6):517-534.

共引文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部