8Michael Ciammaichella, James Tantalla. Tempora- ry Cellular Cofferdam Design, Installation~Removal Willow Island Hydroelectric Project [ C]//Muser Rutledge Consulting Engineers. USA: HydroVision International, 2014.
9Flett I D, Carter M, Hussain N, et al. Incheon Bridge Project-The Role of the Contractor's Chec- king Engineer[C]//IABSE Symposium Report. In- ternational Association for Bridge and Structural Engineering. Switzerland.. IABSE, 2007..41-47.