摘要
汽轮机和发电机检修是CPR1000核电机组大修期间的两个重大检修项目,项目关联性很大,采用项目集管理能带来工期和成本的收益。论文通过对实践工作的总结归纳,给出了项目集管理针对这两个项目的应用方法和过程。
Steam turbine and generator maintenance are two major maintenance projects during the overhaul of CPR1000 nuclear power unit.The project correlation is very big,and the adoption of project set management can bring time limit and cost benefits.This paper summarizes the practical work and gives the application method and process of project set management for these two projects.
作者
尹龙江
YIN Long-jiang(Liaoning Hongyanhe Nuclear Power Co.Ltd.,Wafangdian 116300,China)
出处
《中小企业管理与科技》
2019年第22期29-30,共2页
Management & Technology of SME
关键词
核电厂大修
发电机
汽轮机
项目管理
项目集管理
nuclear power plant overhaul
generator
steam turbine
project management
project set management