摘要 为了安全顺利通过布置有多条平行于工作面空巷的12404-1综采面,分析了乌兰木伦煤矿12404-1综采面顶板岩性参数,按照顶板岩层自重的1.3倍安全系数计算并选择合理支护强度及支护形式,并采用空巷泵送支柱进行了补强支护。回采实践证明"泵送支柱+锚索"联合支护能够完全满足回采期间空巷顶板的稳定性,实现了综采面快速、高效通过多条近距离平行于工作面空巷。 In order to safely and smoothly pass the 12404-1 fully mechanized mining face with many parallel goafs,according to the roof lithology parameters of 12404-1 fully mechanized mining face in Ulan Mulun Coal Mine,the reasonable supporting strength and supporting form are calculated and selected according to the 1.3 times safety factor of roof rock weight.In the course of reinforcement support,the construction is strictly regulated according to the design requirements.Later,through the mining practice,it is proved that the combined support of pumping prop and anchor cable can ensure the stability of the gob roof during the mining period.The fully mechanized face has quickly and efficiently passed several parallel empty roadways.
作者 张国恩 赵建明 胡江 刘虎生 ZHANG Guo-en;ZHAO Jian-ming;HU Jiang;LIU Hu-sheng(Shendong Coal Group Ulan Mulun Coal Mine,National Energy Group,Ordos 017205,China;Ordos Coal Bureau,Ordos 017000,China)
出处 《煤炭工程》 北大核心 2019年第8期35-38,共4页 Coal Engineering
关键词 综采工作面 过空巷 泵送支柱 支护技术 fully mechanized coal mining face crossing empty roadway pumping prop support technology
  • 相关文献

参考文献4

二级参考文献20

共引文献42

同被引文献147

引证文献21

二级引证文献101

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部