摘要 对回采巷道的底鼓特性进行了分析,说明了巷道垂直挤压型底鼓形成的原因,针对煤矿这一现象,利用FLAC3D数值模拟软件进行了支护方案模拟,模拟针对巷道垂直型挤压底鼓的现状进行了无支护方案和底板注浆+工字钢的支护方案的对比。理论研究发现,对于垂直型挤压底鼓的支护应该尽量选择联合支护的高强度支护方案,才能严格控制好底鼓的变形量,从而达到围岩稳定。 This paper analyzes the bottom characteristics of the stope roadway,and illustrates the reasons for the vertical extrusion of the roadway bottom cladding.For the phenomenon of coal mine,the support scheme is simulated by FLAC3D numerical simulation software.Theoretical study found that the high-strength support scheme of combined support should be selected as much as possible to control the deformation of the bottom wall to achieve the stability of surrounding rock.
作者 石峰 Shi Feng(Zhenchengdi Coal Mine,Gujiao Shanxi 030203)
出处 《机械管理开发》 2019年第8期277-278,共2页 Mechanical Management and Development
关键词 垂直型挤压底鼓 FLAC3D数值模拟软件 底板无支护 底板注浆+工字钢的支护 vertical extrusion floor heave FLAC3D numerical simulation software floor no support floor grouting I-steel support
  • 相关文献

参考文献2

二级参考文献26

共引文献20

同被引文献20

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部