摘要
结合武汉绿地中心工程项目建设中机电设备吊装运输的实施经验,总结了作为超高层建筑施工的机电设备吊装和应用的几种常用方法。阐述了这几种方法的选择条件和优缺点,并给出相对应的技术措施,其经验可供参考。
Combined with the implementation experience of lifting and transportation of electromechanical equipment in the construction of Wuhan Greenland Center engineering project,this paper summarizes several common methods of lifting and application of electromechanical equipment for the super high-rise building construction,and also expounds the selection conditions,advantages and disadvantages of these methods.Corresponding technical measures are provided as well.Its experience is available for reference.
作者
张姗姗
孙志国
ZHANG Shanshan;SUN Zhiguo(The Second Construction Co.,Ltd.of China Construction Third Engineering Bureau,Wuhan,Hubei 430074,China)
出处
《建筑施工》
2019年第8期1523-1525,共3页
Building Construction
关键词
超高层建筑施工
武汉绿地中心
机电设备
吊装方法
super high-rise building construction
Wuhan Greenland Center
electromechanical equipment
lifting method