摘要
在深基坑支护设计采用内支撑体系的地下室结构施工过程中,施工到一定程度时需要拆除临时性的内支撑体系才可以继续进行下一步的施工工序。基坑施工中的换撑工作指的是采取一定的措施将基坑变形应力通过传力措施,将地下室结构在内支撑体系拆除后作为新的支撑结构,保持基坑稳定,实现支护变形内力的传导和再分配。
In the construction process of basement structure with inner support system in deep foundation pit support design,the temporary internal support system needs to be removed when the construction reaches a certain level before the next construction process can be continued.The work of changing the foundation pit refers to taking certain measures to pass the deformation stress of the foundation pit through the force transmission measures,and the basement structure is removed as the new support structure to maintain the stability of the foundation pit and realize the internal force of the support deformation.Conduction and redistribution.
作者
郭裕君
于东
Guo Yu-jun;Yu Dong
出处
《建筑技术开发》
2019年第15期150-151,共2页
Building Technology Development
关键词
深基坑
换撑
力的传导
deep foundation pit
changing support
force conduction