摘要
以南昌地铁2号线青山路口站~福州路站区间为背景,基于周边环境复杂、工期紧张、施工条件受限等诸多不利因素,通过多方案比选,合理确定富水砂层盾构接收方案。在南昌地区首次成功运用WSS注浆加固和洞内箱体接收,可为今后类似工程提供借鉴。
Taking the section of Qingshan Road Station and Fuzhou Road Station of Nanchang Metro Line 2 as the background,based on many unfavorable factors such as complicated surrounding environment,tight construction period and limited construction conditions,it is necessary to determine the water-rich sand shield by multiple schemes.Construct a receiving plan.For the first time in Nanchang,the successful use of WSS grouting reinforcement and tank receiving in the cave can provide reference for similar projects in the future.