期刊文献+

89 m高发射塔幕墙安装外脚手架结构设计 被引量:1

Structure Design of Exterior Scaffolding with 89 Meters High Launch Tower’s Curtain Wall
下载PDF
导出
摘要 建筑结构各异使得外墙脚手架的设计情况复杂,传统设计很难满足实际工程中复杂造型结构的脚手架设计要求。本文以南京市高淳区无线光电转播台秀山新址发射塔的脚手架工程为例,针对其结构复杂、不规则、搭设高度大的特点,采用落地扣件式脚手架和型钢悬挑脚手架两种不同形式的脚手架相配合的设计方案,有效保证了本项目玻璃幕墙的顺利安装。 Different architectural structure makes the exterior scaffolding design is complex,the traditional design is difficult to meet the actual engineering complex structure of the scaffolding design requirements.In this paper,the scaffolding project of Xiushan new radio tower in Gaopu District of Nanjing is taken as an example.It is characterized by its complicated structure,irregularity and high height.It adopts two kinds of different forms of scaffolding and scaffolding Scaffolding with the design,effective guarantee of the project glass curtain wall of the smooth installation.
作者 李天福 王永泉 LI Tian-fu;WANG Yong-quan(School of Civil Engineering,SanJiang University,Nanjing Jiangsu210000 China;School of Architecture Engineering,NanJing Institute of Technology,Nanjing,Jiangsu 210000 China)
出处 《江苏建筑》 2019年第4期73-76,共4页 Jiangsu Construction
关键词 不规则结构 落地扣件式脚手架 型钢悬挑脚手架 irregular structure floor fastener scaffolding steel trim scaffolding
  • 相关文献

共引文献13

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部