城轨CTBC信号系统工程项目进度管理是一项多要素综合的系统性事务,引入质量管理的PDCA循环方法,使城轨CBTC信号系统工程项目进度管理按照PDCA循环管理的方法方式进行探索和实践,以研究PDCA循环方法在城轨CBTC信号系统工程项目进度管理中的应用,提出相应建议,并引出进一步思考。
The schedule management of CTBC signal system project of urban rail transit is a systematic project with many elements.By introducing the PDCA cycle method of quality management to make explore and practice of the schedule management of CBTC project of urban rail transit in accordance with the PDCA cycle management method,in order to study the application of PDCA cycle method for the schedule management of urban rail CBTC project,put forward corresponding suggestions,and lead to further thinking.
作者
尉安宇
Yu Anyu(CRSC Urban Rail Transit Technology Co.,Ltd,Beijing 100070,China)
出处
《铁路通信信号工程技术》
2019年第9期65-70,共6页
Railway Signalling & Communication Engineering