期刊文献+

以可靠度为中心的通用飞机机会成组维修研究 被引量:3

Reliability-Centered General Aircraft Opportunity Group Maintenance Research
下载PDF
导出
摘要 针对通用飞机维修难度大、停机损失多的特点,建立了通用飞机预防性机会成组维修模型。采用役龄回退因子描述不完全维修中部件故障率的变化情况,以可靠度为基础,分析各部件预防性维修间隔期。提出用可靠度区间代表机会维修区间的方法,以总节省费用最大为目标函数,可靠度为约束条件,建立机会成组维修模型。最后,通过通用飞机发动机具体实例计算得到如下结论:根据维修间隔期确定机会成组维修策略能够有效地节省系统预防性总维修费用,在选择维修区间时,应根据实际部件维修要求确定合适的维修区间。 Aiming at the difficulty of general aircraft maintenance and the loss of downtime,a general aircraft preventive opportunity group maintenance model is established.The service age fallback factor is used to describe the change of component failure rate in incomplete maintenance.Based on the reliability,the preventive maintenance interval of each component is analyzed.A method of representing the opportunity maintenance interval by using the reliability interval is proposed.The maximum cost savings is the objective function and the reliability is the constraint condition.The opportunity group maintenance model is established.Finally,the following conclusions are obtained from the general aircraft engine specific example:determining the opportunity group maintenance strategy according to the maintenance interval can effectively save the system preventive total maintenance cost.When selecting the maintenance interval,the appropriate maintenance interval should be determined according to the actual component maintenance requirements.
作者 王颖 余芬 WANG Ying;YU Fen(College of Aeronautical Engineering,Civil Aviation University of China,Tianjin 300300,China)
出处 《机械工程与自动化》 2019年第5期47-49,共3页 Mechanical Engineering & Automation
基金 国家自然科学基金青年科学基金项目(61703406)
关键词 可靠度 机会成组 维修区间 通用飞机 reliability opportunity group maintenance interval general aircraft
  • 相关文献

参考文献4

二级参考文献47

  • 1王彤.空调器寿命的可靠性分析探讨[J].家电科技,2005(6):49-51. 被引量:1
  • 2金玉兰,蒋祖华,侯文瑞.以可靠性为中心的多部件设备预防性维修策略的优化[J].上海交通大学学报,2006,40(12):2051-2056. 被引量:40
  • 3蔡景,左洪福,王华伟.多部件系统的预防性维修优化模型研究[J].系统工程理论与实践,2007,27(2):133-138. 被引量:38
  • 4DEKKER R,van der DVyn Schouter F A,Wildeman R E.A review of multi-component maintenance models with economic dependence[J].Mathematical Methods of Operations Research,1997,45(3):411-435.
  • 5ARCHIBALD T W,DEKKER R.Modified block replacement for multiple component systems[R].Technical Report9412/A,1994
  • 6DEKKER R,ROELVINK I F K.Marginal cost criteria for preventive replacement of a group of components[J].European Journal of Operational Research,1995,84 (2):467-480.
  • 7You-tern Tsai,Kuo-shong Wang,Lin-chang Tsai.A study of availability-centered preventive maintenance for multicomponent systems[J].Reliability Engineering and System Safety,2004,84(3):261-270.
  • 8未来中国通用航空业分析预测报告[R].2005.
  • 9香港航空公司某机型维修方案[Z],2002.
  • 10JOSHI D R, JANGAMSHETTI S H. A novel method to estimate the O&M costs for the financial planning of the wind power projects based on wind speed: A case study [J]. IEEE Transactions on Energy Conversion, 2010, 25(1): 161-167.

共引文献83

同被引文献30

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部