期刊文献+

赞比亚慕松达水电站卧式水轮发电机组的安装

Installation of Horizontal Hydro-Generator Units in Musonda Hydropower Station, Zambia
下载PDF
导出
摘要 赞比亚慕松达水电站为修复扩容工程,将原有的5台1MW卧式水轮发电机组升级为1.1MW,再新增2台2.25MW的卧式水轮发电机组,最终使电站的装机容量达到10MW。老厂房的1#~5#机组设计额定水头为29.4m,新建厂房的6#、7#机组设计额定水头为29.2m。本文就该工程的卧式水轮发电机组安装进行总结,为类似设备安装提供借鉴。 In order to repair and expand the capacity of Musonda Hydropower Station in Zambia,the original 5MW horizontal hydro-generating units were upgraded to 1.1MW,and two 2.25MW horizontal hydro-generating units were added,which finally made the installed capacity of the station reach 10MW.The design rated water head of 1#~5#units in old plant is 29.4m,and that of 6#and 7#units in new plant is 29.2m.This paper summarized the installa?tion of horizontal hydro-generating units in this project,and provided reference for similar equipment installation.
作者 曾迎峰 ZENG Yingfeng(Sinohydro Bureau 11 Co.,Ltd.,Zhengzhou Henan 450000)
出处 《河南科技》 2019年第20期55-57,共3页 Henan Science and Technology
关键词 赞比亚慕松达 卧式 水轮发电机组 安装 Mizoda,Zambia horizontal hydro-generator installation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部