东方之门双塔合龙施工工艺分析

Analysis on Construction Process for Connection of Gate of Orient Twin Towers
下载PDF
导出
摘要 根据东方之门独立的两幢塔楼在230m以上顶部整体连接;形成双向曲线并底宽约70m的拱门形式,并且整个合拢段结构跨度大的结构特点,对施工协调性以及对接精度要求非常高。双塔对接安装精度高,结构相互关连,安装先后顺序对结构的稳定性影响大。如何确保各个节点能顺利对接,控制施工过程中结构变形双塔的相对标高,对保证双塔的对接精度尤为重要。 The two tower buildings of The Gate of the Orient are connected together as a whole at the top from 230 m above the ground to form an arch which is composed by two curves and which is about 70 m wide at the bottom.The connected part has a wide span.Therefore,it had strict requirements for the construction harmonization and connection accuracy.Considering the high connection accuracy and complex structural connection,the installation sequence has big influence on the structural stability.How to guarantee the smooth connection of each nodes and to control the relative elevation of the twin buildings with structural deformation during construction are very important for control of the connection accuracy.
作者 封杰 Feng Jie
出处 《建筑技术开发》 2019年第16期92-94,共3页 Building Technology Development
关键词 东方之门 门型结构 双塔合龙 The Gate of the Orient portal structure connection of twin buildings
  • 相关文献

参考文献6

二级参考文献17

共引文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部