期刊文献+

三峡升船机船厢0.4 kV供配电系统 被引量:1

On 0.4 kV Power Supply and Distribution System for Ship Lift Chamber of Three Gorges Project
下载PDF
导出
摘要 对三峡升船机船厢0.4 kV供配电系统及其备自投装置进行了简单的介绍,分析了三峡升船机船厢0.4 kV供配电系统在不同工作状态下,备自投装置在三种工作模式下的优点和缺点,为三峡升船机船厢0.4 kV供配电系统正常工作以及升船机平稳运行提供安全保证。 This paper briefly introduces the 0.4 kV power supply and distribution system and its standby self-switching device for the ship-lift compartment of the Three Gorges Project,and analyses the advantages and disadvantages of the standby self-switching device under three working modes under different working conditions,so as to provide security assurance for normal work of the 0.4 kV power supply and distribution system of the ship-lift compartment of the Three Gorges Project as well as the smooth operation of the ship lift.
作者 李若 石锋 Li Ruo;Shi Feng(Three Gorges Navigation Authority,Yichang Hubei 443000)
出处 《现代工业经济和信息化》 2019年第9期67-70,共4页 Modern Industrial Economy and Informationization
关键词 三峡升船机 供配电系统 备自投装置 Three Gorges ship lift power supply and distribution system standby self-turning device
  • 相关文献

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部