以广西浦北龙门风电场一期工程水土保持方案变更报告书编制为例,通过对比分析工程变更内容,确定变更报告书编制思路,提出了几点建议,为今后的风电类项目水土保持方案变更报告书编制提供技术参考。
Taking the compilation of soil and water conservation scheme change report for the first-stage project of Longmen Wind Farm in Pubei of Guangxi as an example,by comparing and analyzing the content of the project change,the compilation idea of the change report is determined,and several suggestions are put forward,which provides technical reference for the compilation of the soil and water conservation scheme change report of wind power projects in the future.
作者
张传军
杨长春
ZHANG Chuanjun;YANG Changchun(Guangxi T-energy Engineering Consulting Co.,Ltd.,Nanning,Guangxi,530023)
出处
《红水河》
2019年第5期56-58,共3页
Hongshui River
关键词
龙门风电场
水土保持
方案
变更
报告书
编制
Longmen Wind Farm
soil and water conservation
scheme
change
report