摘要
该文以某公司700 t/d浮法线为例,根据退火窑及传动的结构特点及现场安装经验,介绍了退火窑的安装要求、施工准备、安装程序及施工组织等,详细阐述了退火窑窑体、退火窑辊道、过渡辊台的安装步骤及注意事项。
Taking a 700 t/d float lineofa company as an example and according to the structural characteristics of annealing lehr and transmission and on-site installation experience,this article introduced the annealing lehr installation requirements,construction preparation,installation procedure and construction organizations,and elaborated the installation steps and precautions of annealing lehr body,annealing lehr roller and lift-out roller.