摘要
新疆阿尔塔什大坝工程为混凝土面板砂砾石堆石坝,其堆石料区主要为爆破料、排水料,堆石料设计填筑量达1033万m 3。结合现场复杂地形地质情况,选择在附近山体有针对性地开展爆破试验,确定爆破参数,采用深孔梯段爆破技术进行级配爆破料开采,并考虑大体量、高陡边坡的爆破施工安全,能够实现高强度级配爆破料的开采,可为同类爆破工程提供参考。
Xinjiang Altash dam project is a concrete-faced sand and gravel rockfill dam.Its rockfill area mainly contains blasting materials and drainage materials with the designed rockfill capacity of 10.33 million m 3.The complex topography and geology are combined to select the nearby mountain for targeted blasting experiments.Blasting parameters are determined,deep hole bench blasting technology is adopted for graded blasting material exploitation.Huge and high slope blasting construction safety is considered to mine high strength graded blasting materials,thereby providing reference for the similar blasting projects.
作者
刘勇军
张正勇
石永刚
LIU Yongjun;ZHANG Zhengyong;SHI Yonggang(SINOHYDRO Bureau 5 Co.,Ltd.,Chengdu 610066,China)
出处
《水利建设与管理》
2019年第10期7-11,共5页
Water Conservancy Construction and Management
关键词
控制爆破
阿尔塔什
级配爆破料
施工开采
controlled blasting
Artash
graded blasting materials
construction mining