3Mark G S. Reliability-based assessment of ageing bridges using risk ranking and life cycle cost decision analysis[ J]. Reliability Engineering and System Safety 2001,74:263 -275.
4朱瑶宏.杭州湾跨海大桥项目施工期风险分析[D].成都:西南交通大学,2002.
5刘美铭.桥梁事故分析[D].成都:西南交通大学,2010.
6Akintoye A S, MacLeod M J. Risk analysis and man- agement in construction FJ~. International Journal of Project Management, 1997,15 ( 1 ) ~ 31-38.
7Chen T T, Leu S S. Fall risk assessment of cantilever bridge projects using Bayesian network FJ~. Safety Science, 2014, (70) : 161-171.
8Wang Y M, Elhag T M S. A fuzzy group decision making approach for bridge risk assessment [J].Computers ~ Industrial Engineering, 2007, (53) : t37 148.
9Wang Y M, Liu J, Elhag T M S. An integrated AHP DEA methodology for bridge risk assessment [J]. Computers ~ Industrial Engineering, 2008, (54) : 513 525.