摘要 为合理解决风电并网后系统所需AGC备用容量的预测问题,使用极大熵谱分析法对风电波动进行频谱分析,确定了关键时间尺度分量后用滚动平均法对关键时间尺度的风功率波动分量进行筛选,对风电并网引起的AGC调频容量需求进行了量化计算。本文提出了一种基于评价标准修正背景下,综合考虑风电并网、负荷波动、机组计划出力以及联络线计划出力导致的调频容量需求,最终计算得到控制区域AGC调频容量需求的方法。最后以我国西北某区域电网实际的机组和负荷数据为算例,进一步证明了该方法的优越性及经济性。 In order to reasonably solve the problem of AGC frequency modulation capacity demand for wind power grid-connected system.In this paper,the maximum entropy spectrum analysis method is used to analyze the spectrum of wind power fluctuation,After determining the key time scale components,the rolling average method is used to screen the key time scale components of wind power fluctuation,then the AGC frequency modulation capacity demand caused by wind power grid-connected is calculated quantitatively.Based on the revised evaluation criteria,this paper presents a method for calculating the requirement of the AGC frequency modulation capacity demand in the control area by considering wind power grid-connection,load fluctuation,unit planned output and tie-line planned output.Finally,an example is given to illustrate the superiority and economy of this method by analyzing the actual unit and load data of a regional power grid in Northwest China.
作者 吴罗兰 张闯 陈俊慧 许忠义 朱泽伟 余朋军 徐加宝 WU Luolan;ZHANG Chuang;CHEN Junhui;XU Zhongyi;ZHU Zewei;YU Pengjun;XU Jiabao(College of Electrical Engineering&Renewable Energy,China Three Gorges University,Yichang 443000,Hubei Province,China)
出处 《电工材料》 CAS 2019年第5期45-48,共4页 Electrical Engineering Materials
关键词 风电并网 调频容量需求 自动发电控制(AGC) wind power grid-connected frequency modulation capacity demand automatic generation control(AGC)
  • 相关文献

参考文献8

二级参考文献54

  • 1林万菁,刘娆,李卫东,武亚光,张锐,金钟鹤.发电侧电力市场下的AGC容量确定与机组选择[J].电力系统自动化,2004,28(19):17-21. 被引量:21
  • 2赵学顺,汪震,文福拴,甘德强,黄民翔,孙维真.一种新的自动发电控制容量预测和获取机制[J].浙江大学学报(工学版),2005,39(5):685-690. 被引量:11
  • 3周双喜,王海超,陈寿孙.风力发电运行价值分析[J].电网技术,2006,30(14):98-102. 被引量:59
  • 4曹娜,赵海翔,戴慧珠.常用风电机组并网运行时的无功与电压分析[J].电网技术,2006,30(22):91-94. 被引量:65
  • 5HIRST E,KIRBY B. Defining intra- and interhour load swings [J]. IEEE Transaeiions on Power Systems, 1998,13(4) : 1379-1385.
  • 6HIRST E,KIRBY B. Generator response to intrahour load fluctions[J]. IEEE Trans on Power Systems, 1998,13(4) : 1373-1378.
  • 7GEORGE G,JEONG W L. Analysis of load frequency control performance assessment criteria[J]. IEEE Trans on Power Systems, 2001,16(3) :520-525.
  • 8HOBBS B F,INON J,STOFT S E. Installed capacity requirements and price caps: oil on the water, or fuel on the fire[J]. The Electricity Journal,2001,14(6) :23-34.
  • 9AGANAGIC M,ABUL-RAHMAN K H,WAIGHT J G. Spot pricing of capacities for generation and transmission of reserve in an extended poolco model [J]. IEEE Transaction on Power Systems, 1998,13 ( 3 ) : 1128 - 1135.
  • 10MA Xingwang,SUN D,CHEUNG Kwok. Energy and reserve dispatch in a multizone electricity market[J ]. IEEE Trans on Power Systems, 1999,14(3) :913-919.

共引文献165

同被引文献55

引证文献5

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部