期刊文献+

ZPW-2000A轨道电路设备元器件可靠性提升措施 被引量:2

Measures to Improve Reliability of Components of ZPW-2000A Track Circuit Equipment
下载PDF
导出
摘要 国内高铁信号系统快速发展,ZPW-2000A轨道电路在各地区高铁线路中运用占比较高。轨道电路设备的正常运行依赖于元器件的可靠性,在实际应用中,常因元器件的问题引发系统故障,主要对现有ZPW-2000A轨道电路设备中接线端子改进和电气元件材质更换等有效措施进行介绍,旨在对产品更可靠稳定运行提供参考。 With the rapid development of China's high-speed railway signal system,the application of ZPW-2000A track circuit in high-speed railway lines in various regions accounts for a considerable proportion.The normal operation of track circuit equipment depends on the reliability of components.In practical application,system faults are often caused by the problems of components.This paper mainly introduces some effective measures such as the improvement of terminal and material replacement of electrical components in the existing ZPW-2000A track circuit equipment,in order to provide reference for the more reliable and stable operation of products.
作者 陈铖 Chen Cheng
出处 《铁路通信信号工程技术》 2019年第A01期27-29,共3页 Railway Signalling & Communication Engineering
关键词 ZPW-2000A 接线端子 变压器 ZPW-2000A terminal transformer
  • 相关文献

参考文献3

二级参考文献1

  • 1《新编机械工程技术手册》编写组编,郭爱莲.新编机械工程技术手册[M]经济日报出版社,1991.

共引文献38

同被引文献9

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部