摘要
伴随着越来越多新建线路开通,ZPW-2000轨道电路贯通地线成为一项重点验收内容,就紧盯施工质量,提高贯通地线验收项目和办法进行分析,并提出了建议。
With the opening of more and more new lines,the ZPW-2000 track circuit has become a key acceptance content.This paper focuses on the construction quality,analyzes the acceptance items and methods for improving the acceptance of the links up grounding line,and puts forward suggestions.
出处
《铁路通信信号工程技术》
2019年第A01期66-68,共3页
Railway Signalling & Communication Engineering
关键词
接地电阻
物理隔离
验收项目
grounding resistance
physical isolation
acceptance item