3KIM Y K, KIM Y, KIM Y J. Two-sided assembly line balancing: a genetic algorithm approach[J]. Production Planning &-Control, 2000, 11(1): 44-53.
4LEE T O, KIM Y, KIM Y K. Two-sided assembly line balancing to maximize work relatedness and slackness[J]. Computers & Industrial Engineering, 2001, 40(3): 273-292.
5AGRAWAL P K. The related activity concept in assembly line balancing[J]. International Journal of Production Research,1985, 23(2): 403-421.
6BAYBARS I. A survey of exact algorithms for the simple assembly line balancing problem [J]. Management Science,1986, 32(8): 909-932.
7SCHOLL A, BECKER C. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing [EB/OL]. http://www. wiwi. uni- jena. de/Entscheidung/alb/SALBP- Survey. pdf, 2004- 06 - 26.
8BARTHODI J J. Balancing two-sided assembly lines: a case study[J]. International Journal of Production Research, 1993,31(10) : 2447-2461.
9J J.Barthodi^alancing two-sided assembly lines: a case study [ J ] .Interna-tional Journal of Production Research,1993,31(10): 2447-2461.
10Wu Er—fei,Jin Ye,Bao Jin-song.A branch-and-bound algorithm for two-sided assembly line balancing[j].Int J Adv Manuf Technol, 2008,39(9-10):1009-1015.