摘要 秦山核电二期及方家山核电6台机组的PX泵房大修期间需对格栅除污机下方水室进行清淤处理,清淤过程中需用水泵将水室中的淤泥和残水抽出。把核电站PX泵房提升设备伸缩臂作为研究对象,目标参数设定为悬臂梁体积和质量,利用ANSYS Workbench进行参数化设计及求解,在总应力和总位移都有盈余的情况下,以悬臂梁截面尺寸的厚度作为设计变量进行尺寸优化,从而达到设计的要求。 During the overhaul of the PX pump house of Qinshan Phase II and Fangjiashan 6 units,the water chamber under the grille decontaminator needs to be cleaned up,and the sludge and residual water in the water chamber need to be pumped out by the water pump during the process of cleanup.In this paper,the telescopic arm of PX pumping house lifting equipment in nuclear power plant is taken as the research object.The target parameters are set as the volume and mass of cantilever beam.The parametric design and solution are carried out by ANSYS Workbench.Under the condition of surplus of total stress and total displacement,the dimension of cantilever beam cross-section is optimized as the design variable to meet the design requirements.
作者 薛闯 曾庆生 XUE Chuang;ZENG Qingsheng(School of Mechanical Engineering,University of South China,Hengyang,Hunan 421001,China)
出处 《南华大学学报(自然科学版)》 2019年第5期41-45,共5页 Journal of University of South China:Science and Technology
基金 湖南省教育厅资助科研项目(湘教通[2019]90号) 衡阳市科学技术发展计划项目(2017KJ269)
关键词 伸缩臂 ANSYS 尺寸优化 云图分析 telescopic boom ANSYS dimension optimization satellite cloud image analysis