摘要
介绍了华电土右电厂660 MW超临界机组基于电网“两个细则”的AGC快速响应优化相关内容,以及优化后的成果。通过协调子模块优化,以及引入超前响应、模糊控制等先进控制技术,在确保机组协调控制系统品质的同时,实现对机组负荷指令的快速响应。
This paper introduces the optimization of fast response to the AGC of the 660MW supercritical unit in Huadian Tumd Right Banner Power Plant based on“two by-laws”the of the power grid and its achievement.With the optimization of coordination sub-modules and the introduction of advanced control techniques like advancing response and fuzzy control,the quality of the coordination control system of the unit can be guaranteed and the fast response to the load command of the unit can be realized.
作者
王波波
WANG Bobo(Tumd Power Generation Branch of Huadian Inner Mongolia Energy Co.,Ltd.of CHD,Baotou Inner Mongolia 014000,P.R.China)
出处
《重庆电力高等专科学校学报》
2019年第5期27-29,共3页
Journal of Chongqing Electric Power College