摘要 在本篇文章中,我们主要是对南沙港铁路通过广珠铁路向北连接的京广铁路进行了简单的研究,可以发现在2018年的时候,我们在其现浇按埋隧道处发生了有着大量贯穿的竖向裂缝,因此需要对其现场检查,通过检查的内容可以初步的判定为温度裂缝,并且可以发现隧道中的混凝土它的温峰大约在八十摄氏度左右,因此,在这一个过程当中,我们需要使用水化热抑制剂,从而有效的降低混凝土的温度,从而使其隧道裂缝能够得以控制。因此,我们主要是简单的介绍了如何控制隧道的方式以及技巧,希望能够提供给相关从业者一些有效的建议。 In this article, we mainly studied the Beijing Guangzhou railway connecting the northern Guangdong Railway to the north through the Guangzhou Zhuhai railway. We can see that in 2018, we had a lot of vertical cracks in the tunnel at its cast-in-place tunnel. Therefore, we need to check the site. The contents of the inspection can be initially judged as temperature cracks and can be found. The temperature peaks of concrete in tunnels are about 80 degrees Celsius. Therefore, in this process, we need to use hydration heat inhibitors to effectively reduce the temperature of concrete, so that the tunnel cracks can be controlled. Therefore, we mainly introduced how to control the tunnel and the skills, hoping to provide some effective suggestions to the relevant practitioners.
作者 刘虎 Liu Hu(Wuhan Sanyuan Special Building Materials Co.,Ltd.,Wuhan,Hebei 430083)
出处 《江西建材》 2019年第10期118-119,共2页 Jiangxi Building Materials
关键词 现浇暗埋 隧道裂缝控制 关键技术研究 Cast in situ buried Control of tunnel cracks Research on key technologies
  • 相关文献

参考文献5

二级参考文献20

共引文献66

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部