摘要
规划竣工验收后频繁出现挑空楼板补修、室内地面改造、地上停车位增删改等施工改建,重复建设造成资源浪费。综合分析产生这些现象的原因,探索遏止这类现象的可行办法。
After the completion and acceptance of planning, there are frequent construction and reconstruction, such as the repair of empty floor slab, the reconstruction of indoor ground, the addition and deletion of parking spaces on the ground, etc., resulting in waste of resources due to repeated construction. The causes of these phenomena are analyzed comprehensively, and the feasible ways to stop these phenomena are explored.
作者
甘中毅
Gan Zhongyi(Zhangzhou Surveying and Mapping Design Institute,Zhangzhou,Fujian 363000)
出处
《江西建材》
2019年第10期149-150,共2页
Jiangxi Building Materials
关键词
挑空
计容面积
机动停车位
施工改建
Emptying
Capacity area
Motor parking space
Construction reconstruction