摘要 在总结海阳核电一期工程设计变更管理经验基础上,针对核电项目设计变更管理特点及常见问题,以问题为导向,从管理权责、内容审查、影响评估、文件分发、文件标识、执行验证等六个方面,提出了确保设计变更有效管理的相关要求及措施。以海阳核电实践为案例,列举了一期工程具体实施中较为有特点的管理办法。 On the basis of summarizing the experience of Haiyang nuclear power plant phase I project design change management,through problem-oriented method,this paper research and puts forward the measures and requirements of ensuring effective management of design change from six aspects including responsibility,review,assessment,distribution,sign,state verification,aim at the characteristics and common problems of nuclear power plant design change management. This paper also lists some implemented characteristic management measure cases of Haiyang nuclear power plant phase I project.
作者 马腾达 程昭 MA Tengda;CHENG Zhao(Shandong Nuclear Power Company,Yantai 265100,China)
出处 《工程经济》 2019年第10期23-26,共4页 ENGINEERING ECONOMY
关键词 核电 设计变更 常见问题 nuclear power plant design change common problem
  • 相关文献

参考文献2

二级参考文献2

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部