期刊文献+

基于AHP-PUGH的儿童陪伴机器人设计评价研究 被引量:4

DESIGN EVALUATION OF CHILDREN ACCOMPANY ROBOT BASED ON AHP PUGH
下载PDF
导出
摘要 探求感性意象和儿童陪伴机器人设计要素的对应关系,以及方案评价中评价指标的相互影响性。借助AHP法确定评价指标,构造矩阵,得出相对权值。再用PUGH矩阵对方案进行筛选、评分和排序,得出最优方案。实现对产品的综合评价。并将产品方案的分析结果与相应销售数据进行验证,为产品评价方法提供一定的依据。评价结果帮助儿童陪伴机器人造型设计系统的建立提供理论依据,为优选产品方案提供有效的决策工具。 To explore the correlation between perceptual imagery and the design elements of children accompanying robot and the mutual influence of evaluation indicators in the evaluation of the scheme.Using the AHP method to determine the evaluation index,the matrix is constructed and the relative weight is obtained。Then the PUGH matrix is used to screen,score and sort the scheme,and the optimal scheme is obtained.Achieve comprehensive evaluation of products。The analysis results of three product schemes and corresponding sales data are verified to provide a certain basis for product evaluation methods.The evaluation results help children accompany the robot modeling design system to provide a theoretical basis for the selection of product solutions to provide effective decision-making tools.
作者 席银联 董继先 贺雪梅 XI YINLIAN;DONG JIXIAN;HE XUEMEI
出处 《设计》 2019年第21期54-57,共4页 Design
关键词 PUGH矩阵 层次分析法 儿童陪伴机器人 设计评价 PUGH decision matrix Analytic hierarchy process Children accompany robot Design evaluation
  • 相关文献

参考文献9

二级参考文献50

  • 1赵冬梅.一种软件项目的风险评估模型及应用[J].计算机工程与应用,2006,42(23):192-194. 被引量:10
  • 2蔡军.设计战略研究[J].装饰,2002(4):8-9. 被引量:10
  • 3沈建明 王汉功.项目风险管理[M].北京:机械工业出版社,2003..
  • 4Hobday M. Product complexity, innovation and industrial organization[J]. Research Policy, 1998,26(6) :689.
  • 5Starnatelatos M. Probabilistic risk assessment procedures guide for NASA managers and practitioners[ R]. Washington D. C. : Office of Safety and Mission Assurance NASA Headquarters,2002.
  • 6Sen D K, Banks J C, Maggio G, et al. Rapid development of an event tree modeling tool using COTS software[R]. New Jersey: IEEE Aerospace Conference, 2006.
  • 7Epstein S, Rauzy A. Can we trust PRA[ J]. Reliability Engineering and System Safety,2005,88(3) : 195.
  • 8Chen H H, Lee H I Amy,Tong Y H. Prioritization and operations NPD mix in a network with strategic partners under uncertainty [J]. Expert Systems with Applications,2007,33(2) :337.
  • 9王海燕,刘鲁,刘玲.基于GRA和PCA的BP神经网络应用研究[J].管理评论,2007,19(10):50-54. 被引量:9
  • 10诸克军,张新兰,肖荔瑾.Fuzzy AHP方法及应用[J].系统工程理论与实践,1997,17(12):64-69. 被引量:107

共引文献92

同被引文献18

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部