电解镍气孔形成原因及预防措施 被引量:1

Causes and Preventive Measures of Electrolytic Nickel Pore Formation
下载PDF
导出
摘要 对电解镍气孔形成的原因从理论原理和实际生产操作影响因素、电解液中各种离子的浓度、有机物、pH值、电解液温度、电解液循环速度、隔膜袋、残极率进行分析,提出了预防气孔形成和消除气孔的方法和措施。并且针对不同的气孔颜色、形成部位以及气孔面积采取了相应的措施,有效地预防和消除气孔,减轻电镍产品的质量缺陷,提高了电解镍质量。 The causes of formation of electrolytic nickel pore are analyzed from the theoretical principle and practical operation factors,concentration of various ions in electrolyte,organic matter,pH value,temperature of electrolyte,circulation speed of electrolyte,diaphragm bag and residual rate,and the methods and measures for preventing formation of pore and eliminating pore are put forward.Corresponding measures have been taken for different pore colours,forming sites and pore areas to effectively prevent and eliminate pore,reduce the quality defects of electrolytic nickel products and improve the quality of electrolytic nickel.
作者 苏瑞娟 Su Ruijuan(Gansu Vocational&Technical College of Nonferrous Metallurgy,Jinchang Gansu 737100)
出处 《山西冶金》 CAS 2019年第5期139-141,共3页 Shanxi Metallurgy
关键词 电解镍 气孔 原因 措施 electrolytic nickel pore causes measures
  • 相关文献

参考文献2

二级参考文献13

  • 1李建华,程威,肖志海.红土镍矿处理工艺综述[J].湿法冶金,2004,23(4):191-194. 被引量:122
  • 2刘岩,翟玉春,张纪谦,袁磊.从镍精矿中提取镍铁合金的还原工艺[J].过程工程学报,2005,5(6):626-630. 被引量:11
  • 3刘晓民,鹿宁,维利奇科,撒道夫尼克.不锈钢业的迅猛发展促进镍铁生产厂建设[J].不锈(市场与信息),2006(12):13-17. 被引量:2
  • 4兰兴华.世界红土镍矿冶炼厂调查[J].世界有色金属,2006(11):65-71. 被引量:10
  • 5Liu C P. Kinetics and New Technology in Nonferrous Metallurgy [M].Beijing : Metallurgical Industry Press, 2002.75 - 82.
  • 6Antola O, Holappa L,Paschen P Nickel Ore Reduction by Hydrogen and Carbon Monoxide Containing Gases[J]. Miner. Process. Extr. Metall. Rev. , 1995,15 : 169-179.
  • 7Kotze I J. Pilot Plant Production of Ferronickel from Nickel Oxide Ores and Dusts in a DC Arc Furnace[J]. Miner. Eng. ,2002,15 (11) : 1 017-1 022.
  • 8Nayak J C. Production of Ferro- nickel from Sukinda Laterites in Rotary Kiln-electric Furnace [J]. Trans. Indian Inst. Metall, 1985,38 (3):241-247.
  • 9Watanabe T. Ono S,Arai H,et al. Direct Reduction of Garnierite Ore for Production of Ferronickel with a Rotary Kiln at Nippon Yakin Co. Ltd. Oheyama Works[J]. Int. J. Miner. Process. , 1987,19 : 173-187.
  • 10Fatten M,Matthew S Hayes P C. Reduction of Solid Wustite in H2/ H2O/CO/CO2 Gas Mixtures[J]. Metall. Tram. B, 1990,21B: 135-139.

共引文献48

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部