期刊文献+

核电工程设计变更管理研究与改进 被引量:1

Research and Improvement on Design Change Management of Nuclear Power Engineering
下载PDF
导出
摘要 对AP1000依托项目设计变更管理方法进行了研究。分别介绍了设计变更建议、工程设计协调报告的发起和审批流程,分析和总结了依托项目设计变更管理应用实践的优缺点,并结合HAF003等相关法规标准对设计变更管理的要求,提出了核电工程设计变更管理的改进建议,为后续核电工程设计变更管理提供参考。 The AP1000 project design change management method was studied.This paper introduced the initiation and approval process of design change proposals and engineering design coordination reports,analyzed and summarized the advantages and disadvantages of the application practice of project design change management,and put forward suggestions for improvement of design change management of nuclear power engineering combined with the requirements of HAF003 and other relevant regulations and standards,which can provide reference for subsequent design change management of nuclear power engineering.
作者 姚梦凯 YAO Mengkai(Shanghai Nuclear Engineering Research&Design Institute Co.,Ltd.,Shanghai 200233,China)
出处 《能源与节能》 2019年第11期50-52,共3页 Energy and Energy Conservation
关键词 设计变更管理 核电工程 设计变更建议 工程设计协调报告 design change management nuclear power engineering suggestions for design change engineering design coordination reports
  • 相关文献

参考文献1

二级参考文献2

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部