期刊文献+

综采面截割-移架尘源粉尘沉积附壁规律研究 被引量:3

Study on Law of Dust Deposition and Wall Attachment of Cuttingadvancing Support Dust Sources in Fully Mechanized Mining Face
下载PDF
导出
摘要 为对综采面截割-移架尘源粉尘沉积附壁规律进行探究,基于Fluent的DPM模型对综采面的风-尘规律进行了数值模拟。模拟结果显示,粉尘沉积附壁的主要发生区域是采煤区和采煤机下风侧0~20 m的底板和煤壁、采煤区液压支架的上部。根据模拟结果,建议对污染严重的壁面进行喷雾处理,以清除粉尘并防止粉尘再次扩散。 In order to explore the dust deposition and wall attachment of cutting-advancing support dust sources in fully mechanized mining face, simulated the wind dust law of fully mechanized coal mining face based on DPM model of fluent. The simulation results show that the main area of reentrainment of dust is mainly the bottom and coal wall of the 0 to 20 m in the coal mining area and the lower wind side of the shearer, and the upper part of the hydraulic support in the mining area.According to the simulation results, it is suggested that the wall with severe pollution be treated by spraying to remove dust and prevent the re diffusion of dust.
作者 王峰 冯博 王乃国 WANG Feng;FENG Bo;WANG Nai-guo(Liangbaosi Energy Limited Liability Company,Feicheng Mining Group,Jiaxiang 272404,China;College of Mining and Safety Engineering,Shandong University of Science and Technology,Qingdao 266590,China;State Key Laboratory of Mining Disaster Prevention and Control Co-founded by Shandong Province and the Ministry,Shandong University of Science and Technology,Qingdao 266590,China;Inner Mongolia Energy Co.,Ltd.,Shandong Energy Xinkuang Group,Otog Front Banner 016299,China)
出处 《煤炭技术》 CAS 2019年第10期97-99,共3页 Coal Technology
关键词 综采工作面 扩散模拟 数值模拟 沉积附壁 fully mechanized coal mining face diffusion simulation numerical simulation dust deposition and wall attachment
  • 相关文献

参考文献10

二级参考文献119

共引文献245

同被引文献28

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部