7Das A K. Simulation study evaluating alternative initial responses to formation fluid influx during managed pressure study evaluating al ternative initial [D] . Louisiana State University and Agricultural and Mechanical College, 2007.
8White J, Moore S, Faul R. Foaming cement as a deterrent to compaction damage in deepwater production [J]. SPE 59136, 2000,.
9Carlos D D, Tecpetrol S A. A Fuller Successful liner application using foamed cementing technology for low pressure naturally fractured formtions [J]..SPE69489, 2001.
10Robert M, Daniel L B, Shawn R. High-temperature wells with lost-circulation demands and reverse-circulation techniques using foames-cement systems: Two case histories[J]. SPE 84563, 200a.