中部引黄工程是大水网建设中一项重要的工程,暗涵工程是其重要的组成部分之一。本文介绍了总干1#暗涵的水力学及衬砌的计算思路和过程,尤其是衬砌计算采用的程序计算,为工程的成功实施打下了基础。
The Yellow River Diversion Project in Central China is an important one in the construction of large water network,and the subterranean culvert project is one of its important sections.This paper introduces the calculation and processes of the hydraulics and lining of No.1 subterranean culvert in the main trunk,especially the program calculation used in the lining calculation,which lays a foundation for the successful implementation of this project.
出处
《吉林水利》
2019年第9期25-27,共3页
Jilin Water Resources
关键词
中部引黄工程
总干1#暗涵
水力学
衬砌计算
Yellow River Diversion Project in Central China
No.1 Subterranean Culvert in the Main Trunk
Hydraulics
Lining Calculation