随着信息互联网和物联网的深度运用,BIM+智慧工地系统已成为建筑企业提升项目管理水平的重要手段。结合上海森兰星河湾工程项目实际,探究BIM+智慧工地系统在项目管理中的新方法、新思路,并通过采用BIM+智慧工地系统,实现施工现场多方协同管理,提高了工程总承包的项目管理水平,缩短了施工工期,降低了生产成本,也带来了可观的社会和经济效益。
With the in-depth application of information Internet and Internet of things,BIM+and smart construction site system have become important means for construction enterprises to improve the level of project management.Combined with the practice of Shanghai Senlan Star River project,the new methods and new ideas of BIM+Smart construction site system in project management are discussed.By adopting BIM+Smart construction site system,the multi-party collaborative management of the construction site is realized,which improves the project management level of engineering general contracting,shortens the construction period,reduces the production cost and brings considerable social and economic benefits.
作者
范鹤滨
叶文启
吴长顺
陈浩
严玉海
FAN Hebin;YE Wenqi;WU Changshun;CHEN Hao;YAN Yuhai(Zhongtian Construction Group Co.,Ltd.,Hangzhou,Zhejiang 310008,China)
出处
《建筑施工》
2019年第10期1952-1954,共3页
Building Construction
关键词
BIM技术
智慧工地系统
工程项目管理
协同作业
BIM technology
smart site systems
project management
collaborative operation