摘要 循环流化床锅炉省煤器管与省煤器集箱连接部位管道容易磨损减薄导致泄漏,此处管道布置密集、空间位置狭小,发生泄漏后无法更换,检修中常采用切割管道并加装焊接堵头的方法消漏,但存在堵头运行时间短、反复泄漏的问题。从堵头结构、焊接工艺参数及施工几方面分析了堵头发生泄漏的原因,通过改变堵头结构、调整加装位置、优化焊接工艺等措施,提高了堵头焊接质量,保证了循环流化床锅炉稳定运行,可为类似密集管道消漏提供借鉴。 The connection between the economizer tube of circulating fluidized boiler and the economizer header is easy to wear and thin,leading to leakage.The pipes here are densely arranged and have a narrow space,and cannot be replaced after leakage occurs.Cutting pipe and adding weld plug are often used in maintenance to eliminate leakage,but there are problems such as short running time and repeated leakage.The causes of the leakage of the plug are analyzed from the aspects of the plug structure,welding process parameters and construction.By changing the structure of the plug,adjusting the installation position,optimizing the welding process,etc.,the welding quality of the plug is improved,and the stable operation of the circulating fluidized bed boiler is ensured.
作者 马宝国 李静 MA Bao-guo;LI Jing(State Energy Ningxia Coal Industry Group Co.Ltd.,Yinchuan 750411,China)
出处 《石油化工设备》 CAS 2019年第6期77-80,共4页 Petro-Chemical Equipment
关键词 循环流化床锅炉 省煤器 泄漏 堵头 焊接 改进 circulating fluidized boiler economizer leakage plug weld improvement
  • 相关文献

参考文献15

二级参考文献39

  • 1王鹏,柳朝晖,廖海燕,李延兵,朱海跃,李翔宇,陈寅彪.200MW富氧燃煤锅炉传热特性研究[J].动力工程学报,2014,34(7):507-511. 被引量:6
  • 2涂卫红,杨文峰.高压锅炉低温过热器的运行防护措施[J].大氮肥,2004,27(5):344-346. 被引量:1
  • 3张明,马佳龙,戚华山.900MW超临界机组安装焊接特点[J].上海电力,2004,17(4):298-300. 被引量:1
  • 4陈余辉.提高膜式省煤器焊缝质量的有效途径[J].江苏锅炉,2004(4):29-31. 被引量:1
  • 5程刚强,赵红岩,郭建军.CFB锅炉省煤器磨损原因分析及对策[J].河南化工,2005,22(8):49-49. 被引量:2
  • 6DL/T 869-2004,火力发电厂焊接技术规程[S].北京:中国电力工业出版社,2004.
  • 7Basu P, Halder P K. A New Concept for Operation of a Pulverized Coal Fired Boiler Using Circulating Fluidized Bed Firing [J]. Journal of Engineering for Gas Turbines and Power,Transactions of the ASME, 1989: 626-630.
  • 8LIU Qing, LU Junfu, YANG Hairui, et al. The Operation experience of 116MW Circulating Fluidized Bed Hot Water Boiler with Water Cooled Square cyclone [C]. Proceeding of the sina-US coal fored boiler, Beijing, 2004.5.
  • 9Nowak W, Bis Z, Laskawiec J, et al. Design and Operation Experience of 230MW CFB Boilers at Turow Power Plant in Poland. In: Robert B R Ed [C]. Proceedings of the 15th International Conference on Fluidized Bed Combustion.Savannah: ASME, 1999: No. 0122.
  • 10Robert A. Dyr, Anthony L. Compaan, Jerry Hebb, et al. The JEA Northside Repowering CFB Combustion Demonstration Project= An Update. In: Donald W Ceiling, Donald L Bonk eds[C]. Proceeding of 16th International Conference on Fluidized Bed Combustion, ASME, 2001, Nevada, No.22.

共引文献53