期刊文献+

巴西里贝拉超深水项目非作业者联合管理实践 被引量:4

Non-operator joint management practice of Libra ultra-deep-water offshore project in Brazil
下载PDF
导出
摘要 巴西里贝拉项目是中国石油第一个成功的超深水项目,具有合作伙伴多、表决事项多、沟通协调多等特点。项目合作公司创建了五大机制,即为非作业者深度参与决策提供组织保障的联合管理、为非作业者行使决策权提供制度保障的联合决策、非作业者深度参与为项目科学决策提供保障的联合保障、充分发挥非作业者监督作用的联合审计、为非作业者决策提供详细资料和成果基础的成果共享。这五大机制为非作业者公司深度参与联合管理和决策找到了有效途径,取得了显著效果。里贝拉超深水项目意义重大,对中国石油未来深水油气领域发展具有积极而深远的影响。 Libra project in Brazil is the first successful ultra-deep-water offshore oil and gas project of CNPC with several such characteristic as multiple business partners, more voting items, communication and coordination. Joint company constructed five major mechanisms which include joint management, joint decision-making, joint assurance process, joint audit and achievement sharing with all the partners, that help non-operators to find an effective way for to deeply participate in the project management and has achieved a remarkable success. Libra project is of great significance for CNPC and it will have a positive, far-reaching effect on the future development of CNPC in deep-water oil and gas field.
作者 万广峰 刘成彬 王博 李海玮 WAN Guangfeng;LIU Chengbin;WANG Bo;LI Haiwei(CNODC Brazil Petróleo e Gás Ltda)
出处 《国际石油经济》 2019年第10期71-77,84,共8页 International Petroleum Economics
关键词 里贝拉(Libra)深水项目 非作业者 联合管理 管理模式 Libra deep-water offshore project non-operator joint management administration mode
  • 相关文献

同被引文献62

引证文献4

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部