钢管混凝土叠合柱及梁柱节点施工技术 被引量:3

Construction Technology of Steel Tube-reinforced Concrete Column and Beam-column Joints
下载PDF
导出
摘要 结合百色市体育中心二期项目,分析施工重点、难点,对钢管混凝土叠合柱及梁柱节点施工技术进行介绍。针对厚壁钢管柱连接处理、钢管混凝土叠合柱钢筋定位及柱模板安装固定的重点、难点,结合工程实际阐述具体质量控制措施,有效保证施工质量,实施后取得良好的经济效益和社会效益。 Combined with the second phase project of Baise Sports Center,the key and difficult points of construction are analyzed,and the construction technology of steel tube-reinforced concrete column and beam-column joints is introduced. In view of the difficulties in connection treatment of thick-walled steel tubular columns,steel bar positioning of tube-reinforced concrete column and installation and fixing of column formwork,specific quality control measures are elaborated in combination with engineering practice to effectively guarantee construction quality and achieve good economic and social benefits after implementation.
作者 朱其零 黄深红 孔德辅 ZHU Qiling;HUANG Shenhong;KONG Defu(Guangxi Construction Engineering Group No.1 Construction Engineering Co.,Ltd.,Nanning,Guangxi 530001,China)
出处 《施工技术》 CAS 2019年第20期87-90,共4页 Construction Technology
关键词 混凝土 叠合柱 吊装 节点 焊接 施工技术 concrete laminated column hoisting joints welding construction
  • 相关文献

参考文献7

二级参考文献49

  • 1谭伟 黄用军 尧国皇等.某超高层酒店结构体系的选型.哈尔滨工业大学学报,2007,.
  • 2DBJ13-51-2010(福建省标准)钢管混凝土结构技术规程(福建省工程建设地方标准)[S].
  • 3DL-5085/T-1999钢-混凝土组合结构设计规程[S].
  • 4CJB4142-2000战时军港抢修早强型组合结构技术规程[S].
  • 5CECS28:90.钢管混凝土结构设计与施工规程[S].[S].,1990..
  • 6JCJ01-89.钢管混凝土结构设计与施工规程[S].[S].,..
  • 7CECS159:2004.矩形钢管混凝土结构技术规程[S].[S].,..
  • 8DB29-57-2003天津市钢结构住宅设计规程[S].
  • 9CECS 188:2005钢管混凝土叠合柱结构技术规程[S].
  • 10尧国皇,黄用军,宋宝东,孙素文.钢管混凝土偏压扭短柱承载力简化计算方法研究[J].广东土木与建筑,2007,14(10):23-25. 被引量:3

共引文献34

同被引文献21

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部