摘要
文中介绍了罗洲坝水电站工程进水口、尾水金属结构设备的布,各闸门(包括拦污栅)及其相应的启吊设备的结构设计。罗洲坝水电站工程于2017年6月底发电运行,各金属结构设备运行良好。
The paper introduces the metal structure equipment layout of the water intake and tail water, the gates(including trash rack) and the relevant lifting equipment structure design. After the completion of the Luozhouba hydropower station, each metal structure equipment works well in the power generation operation from the end of June 2017.
作者
胡艳玲
张春丰
袁伟
臧海燕
HU Yan-ling;ZHANG Chun-feng;YUAN Wei;ZANG Hai-yan
出处
《东北水利水电》
2019年第11期4-6,71,共4页
Water Resources & Hydropower of Northeast China
关键词
金属结构
设计
罗州坝水电站
metal structure
design
Luozhouba hydropower station