摘要 以北京地铁16号线达官营站为工程依托,对地表变形、管线沉降和建筑物地基变形的监测数据进行分析,得到如下主要结论:地铁车站开挖引起的地层变形划分为初始变形、缓慢变形、急剧变形和变形趋缓4个阶段,各阶段所占比例因工程地质和空间位置等因素而相差各异;地铁车站平行穿越地下管线时,主要引起管线纵向差异沉降,对其横断面受力无明显影响;地层变形主要发生在初支扣拱阶段,初期支护的施作时机和支护刚度的合理确定是地层变形控制的关键。研究成果可为地铁车站穿越既有建(构)筑物的安全施工提供理论依据和技术支撑。 Taking Daguanying Station on Beijing metro Line 16 as the engineering background, the monitoring data of surface deformation, pipeline settlement and building foundation deformation are analyzed, and the following main conclusions are obtained. The ground deformation caused by metro station excavation could be divided into four stages: initial deformation, slow deformation, sharp deformation and slowing down deformation. The proportion of each stage varies due to different engineering geological factors and spatial locations. When the metro station runs parallel beneath the underground pipelines, the difference subsidence in the longitudinal direction of the pipeline will happen, which has no obvious influence on the force of pipeline cross section. The ground deformation mainly occurs during the construction of primary support, reasonable determination of primary support timing and the support stiffness are the keys to control ground deformation. The research results provide a theoretical basis and technical support for the safety construction of metro stations traverses under the existing structures.
作者 张振营 孙玮泽 ZHANG Zhenying;SUN Weize(Beijing Urban Rapid Transit Development Co.,Ltd.,100027,Beijing,China)
出处 《城市轨道交通研究》 北大核心 2019年第11期14-17,22,共5页 Urban Mass Transit
关键词 地铁车站 洞桩法工法 沉降 数值模拟 现场实测 metro station PBA(perspective based architecture) method settlement numerical simulation field measurement
  • 相关文献

参考文献10

二级参考文献88

共引文献204

同被引文献72

引证文献11

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部